Fluxys Winksele

Location
Herent, België
Status
Opgeleverd
Opgeleverd

Description

The compressor station in Winksele in Belgium increases the pressure of the low-calorific natural gas in the pipeline of Poppel on the Netherlands border to Blaregnies on the French border. With a maximum working pressure of 66.2 barg, the regions around Brussels, Leuven and Mechelen are supplied with gas. The station consists of four compressors and provides a maximum compression capacity of 3.500.000 Nm3/h. Each compressor has a power of 18 MW. Iv-Offshore & Energy and Joint Venture partner VSH were the main contractors for the entire project, with Iv-Offshore & Energy also being responsible for the complete design of the compression station and the procurement for equipment. Technical data: Compression Capacity: 3,500,000 Nm³/h Power of each compressor: 18 MW

Expertise: Engineering
Klik op de afbeelding voor mogelijke beeldrechten.
Fluxys Winksele

Werk ook slimmer met Galleo

Galleo brengt projectdata, kennis en AI samen in één veilige, schaalbare oplossing. Toonaangevende bedrijven zoals ABT, DWA, CLAFIS en Witteveen+Bos kiezen al voor Galleo. Sluit je aan.

Neem contact op met Barbara of Kars

We werken zelf in de gebouwde omgeving en adviseren je graag, met praktijkervaring en vakkennis, over wat het beste werkt voor jouw organisatie.

Neem contact op