Wind farm Deil is located around the Deil highway junction and consists of 11 wind turbines. The design of the crane hardstands and site roads was divided over several parties. Windbase was involved with the design of the crane hardstands and roads for 5 wind turbines.

Furthermore Windbase assisted with stability problems that arose during construction at a number of hardstands designed by another party and we were able to ensure that the project could be successfully completed and prevent further delays in construction.

Klik op de afbeelding voor mogelijke beeldrechten.
standard_photo

Werk ook slimmer met Galleo

Galleo brengt projectdata, kennis en AI samen in één veilige, schaalbare oplossing. Toonaangevende bedrijven zoals ABT, DWA, CLAFIS en Witteveen+Bos kiezen al voor Galleo. Sluit je aan.

Neem contact op met Barbara of Kars

We werken zelf in de gebouwde omgeving en adviseren je graag, met praktijkervaring en vakkennis, over wat het beste werkt voor jouw organisatie.

Neem contact op