Wind farm Deil
Description
Wind farm Deil is located around the Deil highway junction and consists of 11 wind turbines. The design of the crane hardstands and site roads was divided over several parties. Windbase was involved with the design of the crane hardstands and roads for 5 wind turbines.
Furthermore Windbase assisted with stability problems that arose during construction at a number of hardstands designed by another party and we were able to ensure that the project could be successfully completed and prevent further delays in construction.