Proton Therapy Center
Description
In Groningen, a proton facility is currently being built. Here, cancer patients will receive precision radiation therapy from the end of 2017: only the tumour is irradiated, while the surrounding healthy tissue is spared. During the treatment, which takes place in a gantry, radiation is released. This radiation may not leave the building. Walls, floors and roofs are therefore made of two to four-and-a-half metre-thick concrete. The volume of 16,000 m3 requires no less than 11,000 m3 of concrete. A special concrete mixture was chosen with a low heat development in hardening, in order to limit the risk of cracks. The shrink reinforcement applied was also optimised. A further interesting fact is that for some years, Groningen has been prone to earthquakes induced by gas exploration there. For this reason, the building has had to be made earthquake-proof.
Expertise: Geotechnics, Seismic engineering, Structural engineering, Architectural consultancy, Architecture, Building services engineering (mep)
Werk ook slimmer met Galleo
Galleo brengt projectdata, kennis en AI samen in één veilige, schaalbare oplossing. Toonaangevende bedrijven zoals ABT, DWA, CLAFIS en Witteveen+Bos kiezen al voor Galleo. Sluit je aan.
Neem contact op met Barbara of Kars
We werken zelf in de gebouwde omgeving en adviseren je graag, met praktijkervaring en vakkennis, over wat het beste werkt voor jouw organisatie.
Neem contact op